This is an old revision of this page, as edited by 122.187.144.98 (talk) at 05:09, 28 December 2023. The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.
Revision as of 05:09, 28 December 2023 by 122.187.144.98 (talk)(diff) ← Previous revision | Latest revision (diff) | Newer revision → (diff)
This list is incomplete; you can help by adding missing items. (July 2020) |
This is a list of designs for crewed lunar landers, spacecraft intended to land on the Moon. A key aspect is achieving a soft landing, and for an ascent stage to successfully escape the Moon's gravity. Another aspect is how many stages the design has to undergo to achieve its objective, and the number of passengers and amount of payload it can carry. Template:Import style
Name | Manufacturer | Operator (program and operational timeline) | Stages | Crew | Payload Mass | Status | Image |
---|---|---|---|---|---|---|---|
Altair | Northrop Grumman | NASA (Constellation, 2005-2009) | Descent, Ascent | 4 | 14,500 kg (32,000 lb) | Canceled | |
Apollo Lunar Module | Grumman | NASA (Apollo, 1969–1972) | Descent, Ascent | 2 | Retired | ||
Boeing Lunar Lander | Boeing | Boeing, NASA (Artemis, 2017–present) | Descent, Ascent | Rejected | |||
Chinese crewed lunar lander | CAST | CMSA (CLEP) | Descent propulsion stage, Lander/Ascent | 2 | Planned | ||
Dynetics HLS | Dynetics | Dynetics, NASA (Artemis, 2017–present) | Single-stage with drop tanks | 2-4 | Rejected | ||
Blue Moon Mark 2 | Blue Origin, Lockheed Martin, Northrop Grumman, Draper Laboratory | Blue Origin, Lockheed Martin, Northrop Grumman, Draper Laboratory, NASA | Transfer, Lander/Ascent | 4 | Planned | ||
LK | RSC Energia/Yuzhnoye Design Office | Soviet Union (N1-L3, 1969-1974) | Descent, Ascent | 1 | Canceled | ||
Lockheed Martin Lunar Lander | Lockheed Martin | Lockheed Martin, NASA (Artemis, 2017–present) | Single-stage | 4 | 1,000 kg (2,200 lb) | Proposed | |
Starship | SpaceX | SpaceX | Single-stage | Planned | |||
Starship HLS | SpaceX | NASA (Artemis, 2017–present), SpaceX | Single-stage | 4 | 100–200 t (220,000–440,000 lb) | Planned | |
BIS Lunar Lander | British Interplanetary Society | Single-stage | 3 | Studies (1939, 1947) | |||
Von Braun Lunar Lander | US (1977) | Single-stage with drop tanks | 20 | 259 metric tons (with a crew of 10) | Study (1952) | ||
Horizon LERV | US Army (Project Horizon, 1966) | Descent, Ascent | 10 - 16 | 2,700 - 22,000 kg | Study (1959) | ||
Lunex Lunar Lander | US Air Force (Lunex Project, 1967) | Descent, Ascent | 3 | 20,500 kg | Study (1958-1961) | ||
Gemini lunar lander | NASA Langley Research Center, (Project Gemini, 1963) | Single | 1 | Canceled | |||
LEK | Soviet Union, (Zvezda Moon base, 1974) | Descent, Ascent, Reentry | 3 | Canceled | |||
FLO Eagle lander | NASA (Space Exploration Initiative, 1992–93) | Descent, Ascent | 4 | 5,000 kg | Canceled |
See also
- Human spaceflight
- Lunar module – Lunar lander designed for human spaceflight
References
- ^ "NASA studying three-stage approach to human-class lunar landers". SpaceNews.com. 2018-11-20. Retrieved 2019-11-08.
- "BIS Lunar Lander". www.astronautix.com. Archived from the original on August 20, 2016.
- "Von Braun Lunar Lander". www.astronautix.com. Archived from the original on August 20, 2016.
- "Horizon LERV". www.astronautix.com. Archived from the original on December 28, 2016.
- "Lunex Lunar Lander". www.astronautix.com. Archived from the original on December 28, 2016.
- "LEK". www.astronautix.com. Archived from the original on 16 March 2006. Retrieved 12 January 2022.