(Redirected from Changshengqiao station )
Metro line of Chongqing Rail Transit
Line 6 Hongqihegou Station platformOverview Status operational Termini Stations 40 (28 on the main line) (12 on International Expo branch) Service Type Rapid transit System Chongqing Rail Transit Operator(s) Chongqing Rail Transit Corp., Ltd Daily ridership 452,300 (2016 Peak) History Opened 28 September 2012; 12 years ago (2012-09-28) Technical Line length 85.54 km (53.15 mi) Track gauge 1435 mm Operating speed 100 km/h (peak)
Route map
Legend
Through-service from/to main line suspended
This diagram:
CRT Line 6 (and the branch line branded as International Expo line ) is the second heavy rail subway line in Chongqing , as well as being the longest rapid transit line in China, at 85.6 km (53.19 mi) long. It opened with provisional revenue service on September 28, 2012, and connects Nan'an, Yuzhong, and Jiangbei districts in central Chongqing.
Interior of a Line 6 train
Opening timeline
Segment
Commencement
Length
Station(s)
Name
Wulidian – Kangzhuang
28 September 2012
13.91 km (8.64 mi)
9
Phase 1 (initial section)
Kangzhuang – Lijia
26 December 2012
3.9 km (2.42 mi)
1
Phase 1 (2nd section)
Ranjiaba
20 January 2013
Infill station
1
Lijia – Yuelai
15 May 2013
12.1 km (7.52 mi)
2
International Expo line Phase 1
Lijia – Beibei
31 December 2013
23.4 km (14.54 mi)
4
Phase 2 (northern section)
Jiuquhe, Tiansheng
28 September 2014
Infill stations
2
Xiangjiagang
26 November 2014
Infill station
1
Chayuan – Wulidian
30 December 2014
19.2 km (11.93 mi)
7
Phase 1 (final section) & Phase 2 (southern section)
Pingchang, Huangmaoping
28 February 2015
Infill stations
2
Caojiawan, Gaoyikou
26 October 2015
Infill stations
2
Jiangbeicheng
28 January 2016
Infill station
1
Yuelai – Shaheba
31 December 2020
13.99 km (8.69 mi)
7
International Expo line Phase 2
Currently named as Southwest University.
Currently named as Happy Valley.
Stations (south to north)
Operational
Under Construction
Covering a distance of 6.7 km, this extension starts from Liujiaping station and branches off towards Chongqing East Station , with 2 stations in between. The project began on 28 March 2022.
Features
Caijia Rail Transit Bridge
The line crosses the Jialing River via Caijia Rail Transit Bridge (Chinese : 蔡家轨道大桥). Construction work began in October 2010 and it was completed in December 2013.
References
重庆轨道客运量9月30日创新高 达到257.4万乘次 .
"重庆轨道交通一号线朝天门至小什字段、五号线一期南段(跳磴至石桥铺段)、六号线支线二期(悦来至沙河坝段)、环线重庆图书馆至重庆西站至二郎段工程初期运营前安全评估服务招标公告" . 2020-08-21. Archived from the original on 2020-08-30.
^ "重庆轨道交通4座车站于12月1日更名" . 2019-11-30.
^ "轨道交通6号线东延项目可研获批 全长6.7公里" . 2022-01-16.
"轨道交通6号线东延伸段开工" . 2022-03-28.
"重庆市蔡家轨道大桥" . Retrieved 2022-09-09.
Public transportation in Chongqing Metropolitan Area (CQ) Chongqing Rail Transit Lines in operation
Under construction
Planned
Trams in ChongqingCR C-train (intercity rail)CR G-train (high-speed rail)Transportation hubs Airports
Railway stations
Categories :
Line 6 (Chongqing Rail Transit)
Add topic
Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.
**DISCLAIMER** We are not affiliated with Wikipedia, and Cloudflare.
The information presented on this site is for general informational purposes only and does not constitute medical advice.
You should always have a personal consultation with a healthcare professional before making changes to your diet, medication, or exercise routine.
AI helps with the correspondence in our chat.
We participate in an affiliate program. If you buy something through a link, we may earn a commission 💕
↑