Line 11 | |
---|---|
Huanyudao station | |
Overview | |
Status | Operational |
Locale | Tianjin, China |
Termini | |
Stations | 21 (in operation) 24 (when complete) |
Service | |
Type | Rapid transit |
System | Tianjin Metro |
Operator(s) | CCCC consortium |
History | |
Opened | 28 December 2023; 12 months ago (2023-12-28) |
Technical | |
Line length | 23.8 km (14.8 mi) (Phase 1, excluding 3-station extension) |
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) |
Operating speed | 80 km/h (50 mph) |
Highest elevation | DC 1500 V with overhead catenary |
Line 11 of Tianjin Metro (Chinese: 天津地铁11号线; pinyin: Tiānjīn Dìtiě Shí Yī Hào Xiàn) is a metro line in Tianjin. The east section of Phase 1 (Dongjiangdao–Dongliliujinglu) started operation on 28 December 2023.
Opening timeline
Segment | Commencement | Length | Station(s) | Name |
---|---|---|---|---|
Dongjiangdao — Dongliliujinglu | 28 December 2023 | 13.68 km (8.50 mi) | 11 | East section of Phase 1 |
Shuishanggongyuanxilu — Dongjiangdao | 28 December 2024 | 10.12 km (6.29 mi) | 10 | West section of Phase 1 |
Stations
- OSI: out-of-system interchange
Station name | Connections | Distance km |
Location | |||
---|---|---|---|---|---|---|
English | Chinese | |||||
Wenjielu | 文洁路 | Xiqing | ||||
Chengjianglu | 澄江路 | Nankai | ||||
Yizhongxinyiyuan | 一中心医院 | |||||
Shuishanggongyuanxilu | 水上公园西路 | |||||
Nankaidaxuebalitai | 南开大学八里台 | |||||
Wujiayao | 吴家窑 | Hexi | ||||
Tonglou | 佟楼 | |||||
Yingbinguan | 迎宾馆 | |||||
Wenhuazhongxin | 文化中心 | (both OSI) | ||||
Yidaeryuan | 医大二院 | |||||
Lishuidao | 澧水道 | |||||
Neijianglu | 内江路 | |||||
Chentang | 陈塘 | |||||
Dongjiangdao | 东江道 | (OSI via Huashanli) | ||||
Xueyuanbeilu | 学苑北路 | |||||
Haihedonglu | 海河东路 | Dongli | ||||
Huanyudao | 环宇道 | |||||
Xueliannanlu | 雪莲南路 | Dongli / Hedong | ||||
Zhaoyuanlu | 招远路 | Dongli | ||||
Dongliwentizhongxin | 东丽文体中心 | |||||
Xunhailu | 驯海路 | |||||
Dongliyijinglu | 东丽一经路 | |||||
Donglisanjinglu | 东丽三经路 | |||||
Dongliliujinglu | 东丽六经路 | |||||
References
- ^ "重磅|天津地铁11号线一期东段明天正式初期运营!". 天津广播. 27 December 2023. Retrieved 27 December 2023.
- "就在明天,天津首条PPP地铁项目地铁11号线一期即将全线开通初期运营". 27 December 2024.
地铁11号线一期项目是市政府2023年、2024年民心工程项目,线路全长23.8公里,设置21座车站,线路西起水上公园西路站,东至东丽六经路站
- Preston, Robert (3 January 2024). "New metro lines serve China's growing cities". International Railway Journal. Retrieved 7 January 2024.
- "天津地铁11号线一期东段开通初期运营". 28 December 2023.
地铁11号线一期东段通车里程13.68公里
- "地铁11号线西段要开通啦!". 27 December 2024.
- "地铁11号线一期工程西段正式进入空载试运行阶段".
该项目西起南开区水上公园西路站、东至河西区东江道站,共设10座车站,长约10.12公里
Public transportation in Tianjin Metropolitan Area (TJ) | |||||||
---|---|---|---|---|---|---|---|
Tianjin Metro |
| ||||||
CR S-train |
| ||||||
CR C-train |
| ||||||
Other CR railways |
| ||||||
Trams |
| ||||||
Transportation hubs |
| ||||||
Tianjin Metro stations | |
---|---|
Line 11 |