Power station in Burundi Dam in Ngozi Province
Marangara Hydroelectric Power Station
Marangara Hydroelectric Power Station is located in BurundiMarangara Hydroelectric Power StationLocation of Marangara Hydroelectric Power Station in Burundi
Official nameFrench: Centrale Hydroélectrique de Marangara
CountryBurundi
LocationNgozi Province
Coordinates2°43′49″S 29°57′54″E / 2.73035°S 29.964927°E / -2.73035; 29.964927
PurposePower
Owner(s)REGIDESO Burundi
Dam and spillways
ImpoundsNdurumu River (Akanyaru)
Installed capacity280 kW

Marangara Hydroelectric Power Station (French: Centrale Hydroélectrique de Marangara) is an 280 kilowatts (380 hp) run-of-the-river hydroelectric power station in the Ngozi Province of Burundi.

History

Marangara was inaugurated in 1986, producing 280 kW of power. The station has two Francis Turbines. It originally supplied electricity to the communes of Marangara, Ntega and Kirundo.

In 2007 it was expected that the Marangara (280 kW), Buhiga (240 kW) and Kayenzi (800 kW) power plants would soon by connected to the national grid through the Musasa substation, which would be connected by a 30 kV line to the Ngozi substation. The project was financed by the Programme de réhabilitation du Burundi (PREBU).

Farmers were compensated to move off the land above the hydroelectric dams, but they returned and resumed farming after a few years. Farmers along the Ndurumu River cut down almost all the trees and planted crops such as cassava and banana. During heavy rainfall tons of earth, stones and trees are washed into the valley, digging huge furrows and forming a mountain of mud and stones in the reservoir.

Marangara was shut down for most of 2016. That year the two alternators were rewound.

In 2012 the station produced 1,393,836 Kwh. In 2021 it supplied 306,480 Kwh. By 2024 the Rwegura Hydroelectric Power Station was supplying Ntega and Kirundo, and Marangara was only serving the commune of Marangara. Erosion waste was deposited in the supply channels and sometimes stuck to the turbines, causing damage. In April 2024 the power station had been out of service for three months. Technicians from REGIDESO Burundi had been unable to repair the turbines. As of June 2024 the Marangara Hydroelectric Power Station had not reopened.

See also

References

  1. Projet d’appui aux projets, p. 1.
  2. Rapport Annuel 2016, p. 12.
  3. ^ Bizimana 2024.
  4. Study on the interconnection of the electricity networks.
  5. Rapport Annuel 2016, p. 10.
  6. Rapport Annuel 2016, p. 14.

Sources

Categories:
Marangara Hydroelectric Power Station Add topic