Misplaced Pages

Markland Grips Viaduct

Article snapshot taken from[REDACTED] with creative commons attribution-sharealike license. Give it a read and then ask your questions in the chat. We can research this topic together.

Bridge in Between Clowne and Creswell, Derbyshire
Markland Grips Viaduct
Coordinates53°16′10.89″N 1°14′13.56″W / 53.2696917°N 1.2371000°W / 53.2696917; -1.2371000 (Markland Grips Viaduct)
CarriesEx-Lancashire, Derbyshire and East Coast Railway
CrossesMarkland Grips Gorge
LocaleBetween Clowne and Creswell, Derbyshire
Characteristics
Design6 stone arches
WidthTwin Standard Gauge Rail
History
Opened16 November 1896
Closed9 January 1967
Location

Markland Grips Viaduct is a former railway viaduct south east of Clowne, Derbyshire, England.

Lancashire, Derbyshire
& East Coast Railway
Legend
Chesterfield (Market Place)
Boythorpe Viaduct over
MR Brampton Branch
and Boythorpe Railway
 
Horns Bridge over
Midland Main Line
GCR Chesterfield Loop
River Rother
Duckmanton Tunnel
Left arrow Great Central Main Line Right arrow
Arkwright Town
Right arrow Arkwright Town Jct (1907)
River Doe Lea
Doe Lea Viaduct over
MR Doe Lea Branch
Bolsover South
Bolsover Tunnel
Scarcliffe Summit
Up arrow MML to St Pancras
Sheffield Midland
Attercliffe Road (MR)
Right arrow Rotherham Masborough
West Tinsley (SDR)
Catcliffe (SDR)
Right arrow Rotherham Masborough
Treeton (MR)
Woodhouse Mill (MR)
UpperLeft arrow Beighton (GCR)
enlarge… Beighton Junction
LowerLeft arrow Killamarsh West (MR)
UpperLeft arrow Beighton (GCR)
Upperthorpe and Killamarsh
Spinkhill
Spinkhill Tunnel
Clowne South Summit
Markland Grips Viaduct
Creswell and Welbeck
Shirebrook North
(Originally Langwith Junction)
Langwith Junction shed
Shirebrook South
LowerLeft arrow
GNR
to Nottingham Victoria (1901)
Shirebrook West
Left arrow
MR (now Robin Hood Line)
Nottingham Midland to Worksop
Right arrow
Warsop
Clipstone Colliery Sidings
UpperLeft arrow
Mansfield Railway
to Nottingham Victoria (from 1917)
Edwinstowe
Ollerton
Boughton
Tuxford Central
Tuxford Works
Tuxford shed
Dukeries Junction
Left arrow
GNR (now ECML)
Kings Cross to Retford
Right arrow
Fledborough
Fledborough Viaduct
over River Trent
Clifton-on-Trent
Doddington and Harby
Skellingthorpe
UpperRight arrow
GN&GEJR
to Saxilby
Pyewipe Junction
Lincoln
Down arrow to Peterborough

Context

The viaduct carried the LD&ECR's double-track Langwith Junction to Sheffield Beighton Branch over a limestone gorge known as "Markland Grips". It was situated midway between the former Clowne South and Creswell and Welbeck railway stations. Opened in 1896, it had six equal stone arches.

Timetabled passenger services over the viaduct ended in September 1939 but summer weekend excursions from Manchester Central to Yarmouth Vauxhall and Sheffield Victoria to Skegness continued until 1964.

Traffic on the line was mostly freight, especially coal but it was used as a relief and diversionary route for Sheffield - Lincoln traffic and for Great Central Main Line. As traffic declined so did the need for the Beighton Branch. Coal was carried on the branch from three collieries by the 1960s - Creswell and Langwith at its southern end and Westthorpe (Killamarsh) at its northern end. The north Nottinghamshire "superpits" sent most of their output to power stations in the Trent valley to the east. By the mid-1960s the Great Central was in terminal decline and traffic over the Beighton Branch could be accommodated on what is now the Robin Hood Line. When the M1 motorway was extended northwards, it would have required an expensive bridge to cross the Beighton Branch. The viaduct had required extensive strengthening for some time.

The viaduct was reinforced by cross members and then by cross members plus beams. These measures were to counteract the effects of mining subsidence. Finally a concrete "tunnel" was built for wheeled and foot users and the viaduct was buried under spoil to turn it into an embankment.

A new connection across fields south of Creswell and Welbeck station was built to connect the Beighton Branch to what is now the Robin Hood Line. The Beighton Branch became redundant and was closed on 9 January 1967 across Markland Grips Viaduct, through Clowne to Spinkhill Tunnel. The tracks were lifted. Langwith Colliery's output continued to go south over the southern section until 8 September 1969, after which it went via the Robin Hood line. Westthorpe's went north over the northern section until the colliery closed in 1984.

After closure railway land was sold and the trackbed was used to access the viaduct site which was mined for limestone. These operations finished about 1973. The concrete tunnel was still in place in 2012.

Modern times

Clowne South station site was for a number of years a community skate park, but after much antisocial behaviour, this was removed, the land sold and houses built on it instead. The railway trackbed from there southeastwards towards the site of Markland Grips Viaduct is the publicly accessible Clowne Linear Park. The trackbed south of the viaduct site to Creswell is used as a footpath, but its legal status is unclear.

Markland Grips is an SSSI managed by Derbyshire Wildlife Trust, who list them as Hollinwell and Markland Grips. External links to relevant websites are given below.

References

  1. Cupit & Taylor 1984, p. 46.
  2. Dow 1965, p. 159.
  3. ^ Little 1995, p. 67.
  4. Walker 1991, inside front cover.
  5. Summer 1964 Working TimetableA: via flickr
  6. Summer 1964 Working TimetableB: via flickr
  7. Anderson & Cupit 2000, p. 53.
  8. Markland Grips Viaduct(1) via Picture the Past
  9. Markland Grips Viaduct(2) via Picture the Past
  10. Markland Grips Viaduct(3) via Picture the Past
  11. Markland Grips Viaduct(4) via Picture the Past
  12. Booth 2013, p. 42.

Sources

External links

Categories:
Markland Grips Viaduct Add topic